menuFGD1 menuFGD2 Flue gas desulfurization menu flue gas desulfurization menu2


..MOUSE OVER NEWS TO SLOW


Proposal Request

The Proposal Request data sheet should be filled out as completely as possible
in order to help us better understand the nature of your problem and/or requirements.

How did you hear about Ducon?

Contact Name:

Company Name:

Address 1:

Address 2:

Telephone:

Fax:

Email:


Source of Dirty Gas:

Quantity of Dirty Gas:

ACFM

SCFM

LBS/HR

Other Unit:

Gas Inlet Temperature:

Fahrenheit

Celsius

Gas Inlet Pressure:

IN. WG.

PSI

KPa

Other Unit:

Inlet Particulate Loading:

LBS/HR

GR/DSCF

KG/HR

Other Unit:

Particle Density:

LBS/FT3

KG/M3


Inlet Gas Particle Size Distribution:

Particle
Micron Size

WT.%
Less Than

Particle
Micron Size

WT.%
Less Than

Particle
Micron Size

WT.%
Less Than


Inlet Gas Composition:

% by WT.

% by VOL.

LBS/HR

KG/HR

Other:

Gas
Component

Amount

Gas
Component

Amount

Gas
Component

Amount


Do you know the type of equipment you need?

Pressure drop available for Ducon equipment:

INCH. W.G.

Plant Location:

Altitude, FT.

Reason for control equipment:

APC Code Compliance

Recovery

Nuisance

Outlet particulate loading required:

LBS/HR

GR/DSCF

KG/HR

MG/NM3


Gaseous Pollutants Removal Efficiency Required:

% Removal

LB/HR Out

MG/NM3 Out

Other Unit:

Pollutant
Name

Amount


Additional Comments/Requirements:

Quote Required:

Budget Only

Need Firm Quote

Date Required By:

Month:

Day:

Year:


  

   
 
Copyright © 1938-2012 DUCON.com • All Rights Reserved